Tuesday, November 13, 2007

October update

Well the latest update has not shown as much visual progress had I had hoped but that is purely down to us discussing how we were going to tackle the top deck and changing how we are doing it. We have a lot more detailed drawing for upstairs and of course we now have a lower deck that we know is correct to build up from. As such we have just completed cutting, preserving, shaping and restoring all the framework required to get the project above the upstairs windows and they will start going on at the end of this week. In the meantime as can be seen, the staircase was completed as was the conductors area and staircase bulkhead. The between decks aluminium has gone in as have the upper deck floorboards, which have now been sanded, treated and varnished. As can be seen RT8 has a friend visiting in the shape of RT113, the only other 2RT2 that is fully preserved and roadworthy. Interestingly the two buses entered service on the same day, at the same garage in 1940. Do pop by next month when hopefully a large step forward will have been taken and will be posted up here the first week in December.





4 comments:

paulybusbob said...

I have just discovered this great site, well done on the fantastic work you are doing on this grand old lady of London. I wil keep visiting the site,is it possible to visit ensign to seethis and the other buses?

Paul

Anonymous said...

Great to see the progress being made. Just love the rear view pic of RT113 showing off the roofbox. Two together will be quite something and if RT1 could reappear with them in the future that would be the crowning glory. Alan H

Anonymous said...

A fantastic project, keep up the great work. Your achievements so far are remarkable!
It's amazing what's still about!- check out item 190182794215 on a well known internet auction site.

Anonymous said...

Paul,

If you want to email me through the main website, the info@ address, I am sure we can arrange a visit for you.

Cheers
Steve