Well July has been a good month for progress and August is all set visually to be either better. Its been a three pronged attack on the body work following the wiring all going in during the early part of the month. From there the rear upstairs was tackled with the blindboxes completed, the rear seat, stairwell and handrails all going in as well as the last biths of framework around the top of the stairs. All added together its left the rear looking very RT'like. The window cappings and surrounds have all been temporarily fitted to check sizes before being removed again at a later date and rexined. Meanwhile the cab has been started by our willing volunteer Tony (many thanks) and the floor removed before we start putting it back together again, even an old LT collar badge was found wedged underneath the cab seat area!. The last thing started has been the front upstairs area with internal panels around the blind box being fitted and now we are working back. Back to monthly updates now so on or around Aug 31 should bring the next one.
1 comment:
Marvellous stuff - thanks indeed for your efforts.
Post a Comment