Friday, July 2, 2010

So she returned from paint two weeks ago and all efforts have been made to try and finish her within the next two weeks. As you can see the upstairs is getting there, all the rexined panels are on and the last fittings and cappings are going on, before the ceiling beading goes back and can then be painted.

A closer view of the front shows some of the 2RT differences such as the mouldings that hold the T shape pieces are covered in rexine, whereas on the later versions, both the sleeve and these cappings were all chromed.

Downstairs is not as advanced as up, and the light for the photo was also far worse, so apologies but I think the general gist can be seen as rexined panels go back and it starts to take the look of an RT.

Now I couldn't decide what to do about showing the exterior as it has been painted and is now being signwritten with adverts, (it looks great I have to say) but seeing as some of you were keen to see it painted and others wanted to wait until the finished item, and seeing as there was debate about what livery it would be wearing, I decided to include some shots of it on the day we collected her, so painted yes, complete no.... here you go




And there is the famous rear view with rear roof box...

.. And one last one to tease you all a bit with... So its all hands on deck to finish her now. On or around July 30 if all has gone to plan there should be an update here showing you the finished item...

Steve

Monday, June 7, 2010

Well a slight delay but hopefully worth it.... The reason for the delay was that the engine went in and out 8 times eventually, to solve various leaks, (oil, water and air) and all the other various issues associated with getting a 70 year old bus back on the road after such a long absence.

But today she enjoyed the sunshine, blinked a few times having come out of her long term bay and went for a drive to the paint shop. I'm pleased to report the 30 minute trip went perfectly and she didn't miss a beat.

So with mechanicals now done, electrics in and the exterior complete, we are down to paint and interior as well as of course the small matter of MOT and COIF, but the journey is nearly complete....


Which brings me on nicley to this blog and its conclusion.

The question is how much do I show now of RT8 before its official unveling... The plan is that it will debut 99% finished at my wedding on July 17, before having a full public unveiling on July 30. So do I show it painted or do I in the next update stick to just interior shots and be a terrible tease? I haven't decided as yet... but what I will say is that I will do an update on July 1/2 and then most definitely another one immediately after the public debut on July 30. I will then change the course of the blog over to a general museum one that I will update monthly still and show both large projects and more minor work, and all the stuff that goes on behind the scenes to keep the fleet running as a number of you have expressed an interest in this.

Cheers for now
Steve

Friday, April 9, 2010

So, all in all a bit disapointing in terms of visual progress due to the delays in the mechanical side that led to RT8 being in the main workshop for three weeks. First the air tank blew out, then all the pipes went the same way, the water pump went U/S, the fuel tank decided to start leaking, the engine decided it wanted to join in sympathy and offered us an oil leak, and after we finally got most of those cured and gave her a good run, the fly wheel has now got a leak! Sadly this will result in the bus returning to the workshop this month and having the engine removed for this to be resolved. On the bright side the gears and brakes all ran really well and the vehicle was driving as other wide you would hope, so in short we have a fly wheel oil leak to resolve and an air system unloader valve..... for now.
But that has not stopped work continuing and whilst the engineering was being tackled body work continued with the bonnet, wing, rear mud guard etc all being prepared to go back on. The faulty fuel tank now rectified has gone back on which allows the rest of the nearside to be panelled up. As can be seen the last of the lower framework has gone in place as have the brackets that hold the life guard rail. Now they are on the rear mudguard can be fitted and then the last remaining panels, which are the current bits being worked on.

A close up of the fuel tank, which interestingly is cylindrical on 2RT2's and not on the post war versions. The 'life guard/dog rail' brackets can be seen in place which are situated a little higher than original but still within the legal limits for COIF, this is a result of seeing the damage modern day speed bumps can do to them and regularly do, not something that was ever taken into account by the 1930's designers.

And the offside has now been pretty much completed, with the last of the beadings going on. The air system inspection panel is currently off as this needs further work, but other than that it only requires garage codes, the half round advertising 'runner' and the panel around the cab to be screwed into place, which for the moment will not be done to make access to the electrics easier. So if mechanicals and exterior can be finished by next month then the summer completion date is still on, lets hope for a smoother month than this has been.

Friday, March 5, 2010

March 5

Well a few more pictures this month as lots has been happening. The first part of the month saw most of the offside panelling fitted, the fuel tank cleaned out and refitted, the fuel system drained and cleaned and the air system blown through, diif and gearbox oil were alos changed. Then on March 1 RT8 moved from its long term restoration bay to the main workshops for its engine refit....

Monday and Tuesday were spent getting the engine in, whilst by Wednesday the radiator was being fitted, therefore giving the RT its 'face' back.

Whilst up in the air having pipes and systems connected the progress to the offside can be seen. The 'flared' rear wheel arch with mud guard that has a 'tail' are very distinct 2RT features.
After a failure on Thursday morning to get her running a second attempt was made Thursday afternoon after changing the fuel pump.

On Thursday afternoon we had success in firing her up and she ran sweetly, not stalling on tick over and producing very little smoke. We did video this but alas it appears the blog won't accept the footage so I will try and get someone more clever than me to upload it to the main site. Once the run up was complete, she went back up in the air so that the fuel system could be checked as the supply from the lift pump was slow and the air system was not building as it should.

By Friday morning the fuel system had been sorted and the bus would happily start 'on the button' and tick over at a steady pace. The throttle was checked as was the stop to make sure all was in order, after minor adjustments all was well and attention turned to the air system.

The nearside still requires its lower panels but these were needed to be off to access the small fuel filter that resides just behind the front wheel.

The air system proved more troublesome and as today slipped by it looked unlikely that she would be returned to the restoration bay under her own power. One air pipe blew under the pressure, this was quickly replaced, and on the next run up the air pressure got to the magic 120psi, only to fall back quickly as soon as the vehicle went to tickover.

Another attempt was made which successfully rectified a leak only for a valve to then stay stuck open and thus let the air escape again. So it would appear we failed to drive RT8 out due to one sticking valve but this is now off and being fixed and after Monday morning services for the fleet, attention will once again turn to getting RT8 going. As soon as she does she will go on the brake rollers for a test to see how good they are at the first time of asking and how much we need to do to adjust them to get them up to MOT standard.

So an interesting month, which has seen her move from static project to almost running unit. The priority will be to get all the mechanicals finished next week so that she can return to her bay. At that point the remaining panels, wings and bonnet can be fitted which will just about complete the exterior. With mechanical and exterior done the attention will turn to exterior painting and interior fitting out, so who knows what you will find here next month.....

Monday, February 8, 2010

February 8

A really good month for progress! Firstly the cab area has been completed as can be seen. The front mud guards have been repaired and fitted, the foot hold and electric booster panel all repaired and fitted and the inspection panel and all its holding fittings is also now back on. The lower deck panelling is all now being fitted and is the current job.

RT8 is also now off its long term axle stands. The rear brakes have been relined, completely overhauled and put back together, allowing the wheels to be fitted and the vehicle to stand up on her own 'feet' again.

Also completed was the lower deck flooring, the wheelarches have been fitted and indeed the bench seats are now in place as well.

As mentioned before the lower deck offside panels are the current project but before these can be done, the brackets that hold the 'life guard' to prevent people or animals going under the bus need to be fitted. Alas RT8's were beyond repair so all new ones are being produced, such as this one now fitted at the rear.

And lastly the plans for the next month... Firstly the aforementioned brackets will be fitted, the remaining panels, mudguards and then life rails, will see the outside of the vehicle completed, with the exception of the engine bay area, bonnet and front NS mudguard. Of course there is no pointing in fitting those until the engine is in. So on completion of the bodywork attention will once again switch to the mechanical side, with first the wiring loom going in and then the engine and radiator. As can be seen the fully reconditioned engine awaits ots top cover of black paint that will be done this week in preparation for its fairly imminent refitting. Whether that happens before the next update is unclear, so best you pop back and see in roughly 4 weeks! Until then cheers for now!

Monday, January 11, 2010

Start of the New Year

So a Happy New Year to everyone!

Well its funny when you do projects like this there suddenly seems to be a point where things are moving quickly and you can sense a change in momentum and for some reason that seems to be the case now. Maybe its because engineers are also now working on the bus in servicing the last of the brakes and getting ready to put the engine in fairly shortly.

So a good place to start with a view of the offside rear stub as all the drums and pads are off as it is serviced and bought up to standard. Interestingly the guy working on this (Bernie) has worked on RT's for years and has never seen the same brakes or half shaft on any other RT, including even on RT8's nearside. Clearly they were updated to the latter post war type in their service life but the offside of RT8 remains as it was built. Fortunately everything is in good shape and the pads themselves are the same so for once one of the oddities is not going to cause us an issue.

The nearside was done sometime back and whilst the wheel has again been removed to assist in fitting the wheelarches as soon as the offside is done the wheels will go back on and she will come off axle stands and stand on her own 'feet' for the first time in a long while.

Looking in from the platform, the wheelarches and associated bench seats are now in place and fitted. The remaining floor boards are now going down which will complete all the flooring on RT8. It will then be treated again before the slats are laid but this will not be an imminent job, even though they are now all cut and ready to be fitted.

Looking at the nearside you can just see the inspection panel to get to the diff for topping up the oil level. Also you can see the seat frame which makes up part of this whole unit, which due to its weight and size is a fairly cumbersome part to fit. Another little known fact is that the seat frames on the 2RT2's were painted green, whilst on the post war variants they were brown. Interestingly this practice seemed to last through to the end for 2RT2's as all RT8's were green (if it looks brown its surface rust I'm afraid!) and a few other frames we acquired that also came from 2RT2's were also green and had never got even a light coat of brown.

This coming month will see the last of the floor boards laid, then the external panels around the wheelarches and the last remaining glazing done. The brakes will be finished and the wheels refitted and if all this is done and then being able to roll we may well move her into an engineering bay and get the engine fitted and run up to make sure all is OK in that department.

Of course to see how much we complete of that you will need to come back next month and see, sometime hopefully around the 7th should be the next update.

Cheers for now